Client: Tweeds / Location: Liverpool / Duration: 20 weeks
This project was for the demolition of the existing steel frame and traditionally built buildings which consisted of, warehouses , office accommodation and a former car showroom.
This site was an area of major historical significance and also including a degree of enabling works for the archaeological team and the "Time Team" to investigate the site of the original , or , "Lost Docks" in the "muddy pool"!